Here are DHBT trustees, @bazza_joyce and Allan, at Wingfield Station this morning for our meeting with @heritagefunduk
They’re taking a look at the chimney shafts that had to be replaced during the Phase One urgent repair works undertaken by @asbc_ltd
In the end we actually ended up having to replace fewer shafts (3) than we originally feared. With most of the other component pieces, the fabric at lower level was able to be re-used and/or repaired.